Skip to main content

TW30 Workover Rig

DescriptionTW30 Workover Rig

The TW30 TA-A3 workover rig is a self-propelled rig intended for oil or gas well workovers and recompletions.

Technical details:

Rig

Maximum load at hoisting hook 30 tf;

Length of operated pipes: 9 ÷ 11 m;

Clear mast height: 17.4m;

Diameter of hoisting cable: 22 mm;

Diameter of bailing cable: 14mm;

Number of crane ropes: 6;

Speed gears of the drawworks 4+1R;

Recommended working depths for:

Recompletions with3 ½” (q=23.06 kg/m) drilling pipes: 1,200m;

Recompletions with 2 7/8” (q=15.47 kg/m) drilling pipes: 1,800m;

Well workovers with:

·         3 ½” (q=13,8 kg/m) tubing: 2,000m;

·         2 7/8” (q=9,58 kg/m) tubing: 3,000m.

Maximum accepted wind speed:

·         with load on hook 70 km/h;

·         without load on hook 120 km/h.

Mast can be tilted by means of an hydraulic cylinder;

Anchorage: 2 resistence anchors connected to the chassis;

Overall dimensions during rig transportation:

- length 16,290 mm;

- width 2,500 mm;

- height 3,940 mm;

Working environmental temperature: -29˚C … +40˚C.

Chassis

1. Vehicle type: TATRA 815-280 R21-28 270-6x6.2/451;

2. Motor type: T3C-928-80 EURO III;

- power/turns 270 kW (367 CP)/1,800 rot/min;

3. Hydrodynamic transmission

- model: Allison CLT 754;

- hydrodynamic  transmission with TC 496 incorporated hydrodynamic torque converter;

-pneumatic gear switch;

-speed gears: 4 +1R;

  • Depending on the rig fit-out, it can perform the following operations:

- run in and pull out of hole tubing string

- drilling of cement or sand plugs;

- works designed to start well production;

- bailing and swabbing operations;

- other well operations at depths specific to hook loads up to 30 tf.

  • Equipment available at SIRCOSS and its location according to areas of operation​
 
Location SIRCOSSUnits
Medias Services Unit7
Mures Services Unit6
Ploiesti Services Unit2
  • Number of operated wells
Year20092010201120122013201420152016
 
Year20092010201120122013201420152016
Number of Wells689095106104978484
TW30 Workover Rig

 

Despre noi

Romgaz undertakes geological exploration in order to discover new gas reserves, produces methane by exploiting the reservoirs included in the company portfolio, stores natural gas in the underground deposits, interventions, workover and special operations on wells and technological transport. In 2026, ROMGAZ continued its development and vertical integration strategy by taking over AZOMUREȘ’s production operations, one of Romania’s leading producers of fertilizers for the agricultural sector.