IP30 Workover Rig

IP30 Workover RigDescription

IP30 rig is a self-propelled equipment mounted on a TATRA chassis T815-280R25 28 270-6 x 6.2/451.

  • Technical details:

1.    Maximum load at hoisting hook: 30 tf;

2.    Lifting speed of hoisting hook: 0.2 ÷ 1.2 m/s;

3.    Recommended working depth for 2 3/8 in tubing: 3,000 m;

4.    Diameter of operated tubing: 2 3/8 in; 2 7/8 in; 3 ½ in;

5.    Length of operated tubing: 9 ÷ 11 m;

6.    Chassis type: TATRA T 815-280R25 -28 270-6x6.2/451;

7.    Chassis with 3 axles, protected all-wheel drive;

IP30 Workover Rig

8.    Diesel motor power at 1,800 rot/min 270 kW;

9.    Power take off source is the chassis power take off joint;

10. Power take off type 1TPP150;

11. Maximum driving speed 45 km/h;

12. Axle base 4,600x1,320 mm;

13. Maximum power input at cable hoist 200 CP;

14. Maximum pull of cable on wheel: 8 tf;

15. Diameter of hoisting cable: 22 mm;

16. Speed gears of drawworks: 3 - R;

17. Mast MU-30;

18. Clear  mast height 17,250 mm (from the ground up to beneath the beam of the crown block);

19. Hoisting hook: 3.22.560 MC-32, maximum working load at the hook: 30 tf;

20. Overall dimensions during rig transportation (L x l x H) 16,500x2,800x4,000 mm;

21. Rig weight while in transporting position 27,600 kg;

22. Environmental temperature: - 40°C ÷ + 40°C.

Tatra chassis:

1.    TATRA chassis type: T 815-280R25;

2.    Three axles type, all-wheel drive;

3.    Power take off type: 1 TPP 150;

4.    TATRA motor type: T3C-928-80 EURO III;

5.    Gear box type: TATRA 10 TS 160;

6.    Diesel motor power at 1,800 rot/min 270 kW;

7.    Maximum power take-off at 1,240 rot/min 120 kW.

Depending on the rig fit-out, it can perform the following operations:

- run in and pull out of hole tubing string

- milling of cement or sand plugs;

- works designed to start well production;

- bailing and swabbing operations;

- other well operations at depths specific to hook loads up to 30 tf.

  • Equipment available at SIRCOSS and its location according to areas of operation

 

 

 

Location SIRCOSS

Units

Mures Services Unit

2

  • Number of operated wells

 

 

 

 

 

 

 

 

 

 

Years

2009

2010

2011

2012

2013

2014

2015

2016

Number of Wells

10

8

9

6

6

10

10

9

IP30 Workover Rig